Sorry, out of order. This was done before the skinning, I just forgot to post.
Before we get the cement poured, we need to stub in the electrical. We are ‘splicing into the barn power for this:


And then the cement was poured:


I wanted to build a paint booth for the shop. I wanted it to help keep over spray down and provide at least a little ventilation. Here is what I cam up with.
I had a 4×8 sheet of hard board from another project. I measured everything out and cut it up:
In the back panel I drilled out some 2 and 3 inch holes in a 20×20 square. The same size as an air filter:
I then made a frame to hold a 20×20 AC filter. Again using scrap I had laying around:
I used Gorilla tape to hold it all together. The hard board is too thin to nail and if I needed to, I could cut the tape and lay it down.
Back Side:
Lastly, I added some lights and a lazy Suzann:
I wanted to make a portable air dryer/regulator for use with my paint booth, air brush or any other system that could and would move around my shop. Here is what I came up with:
Made a tee with scrap pine 1×6, glued and screwed.

Then added Harbor Freight Dryer/Regulator and coil line. Quick and easy, gets the job done.

Wanted to make a box to hold my sandpaper. Nothing fancy, just quick
Using ½ ply I ran rabbits along the top and bottom and and ¼ inch slots every inch. Glued and tacked it all together. I am using the ratchet clamp for the first time:

Worked pretty good!

Sealed it up:

Cut and slid in some ¼ inch hard board I had:

Marked and ready to go:

You must be logged in to post a comment.