Elgin Shop – Electrical Part 1

Started on the electrical. First we ran the cable puller through to make sure everything was clear. Then we put boxes 42 inches up from the floor and ran the plastic conduit:


Next came the breaker box.


Next we ran all the cables. They are all marked, labeled, and color coded, we know what run goes to what. Still need to run the conduit to the breaker box.


And:


Soon we hope to trench in the 3 strands of 2/0 to the breaker box and get it hooked up and start working on the plugs and lights.

Copy Protected by Chetan's WP-Copyprotect.