Got 7 of 9 truck loads of road base. Each load is 15 tons for a total of 135 tons. It will be used in the foundation, they might be able to start the week after Thanksgiving.
Month: November 2013
Elgin Shop – Contract Signed!
Well it has been over 3 months here at the new place and we are bursting at the seams from our down sizing. We decided to bite the bullet and get started on the new shop. YEA! Contract is signed and it will be built by mid December. I went with a 30′ x 40′ metal building by Ark-La-Tex
Here is a quick sketch of the floor:
The Circles are floor plugs. I will post as more happens over the next month or so.