Well the external wall framing is done, stick a fork in it! Here is a shot of the fire breaks:
Here are the anchor bolts:
Next up, interior wall and ceiling brackets.
Here is the setup I am using to get it done. Allows me to put up 6 studs at a time. The ends I do with just the ladder. You can see the spring clamp holding the spacer stick or “story stick” lets me move quick and consistently.
I dont think I can get anything done during the week, I hope to get it done this weekend so I can start on the walls.
Slab all finished up.
You must be logged in to post a comment.